LatestBuying guide
MOQ Explained: Why Some School Furniture Models Start at 20 Sets and Others at 200
How model-level minimums are set, what raises them, and how to plan a mixed-model order that meets them.
Read articleOEM / ODM · 3 owned factories in Jiangxi · 25-day lead time
Insights
What we explain to buyers before the deposit — standards, materials, samples and the details that decide how furniture looks in year three.
LatestBuying guide
How model-level minimums are set, what raises them, and how to plan a mixed-model order that meets them.
Read articleMaterials
Name banded panels and moulded parts separately, and check the fixing line before approving an edge.
Buying guide
Seven questions that separate a factory from a trading company, and how to read the answers.
Production
The five checkpoints between raw material and a loaded container, what each one catches, and where their limits are.
Production
The six steps of an order, what you provide at each stage, and where the 25-day schedule depends on you.
Buying guide
An order specification checklist covering set contents, dimensions, materials, packing and supporting documents, with examples from the current catalogue.
Buying guide
Compare the same pupil places, set contents, installation and maintenance period. Use the worksheet to identify costs before claiming a saving.
Materials
Check the coating description, powder datasheet and batch evidence. Distinguish factory photographs from measured thickness and test results.
Production
Four approval stages for a school furniture order: the specification, reference sample, production inspection and dispatch record.
Buying guide
A comparison sheet for matching set contents, materials, packing, trade terms and order scope before comparing quoted totals.
Standards
Specify matched seating and table dimensions, check the required standard and edition, and document the intended settings for adjustable furniture.
Materials
Compare the board grade, edge construction, approved sample and supporting reports before treating two desk quotations as the same specification.
Send the model or the tender clause. You get an answer from the factory, not a brochure.