Before paying a deposit, the buyer and supplier need an agreed specification for each order line. A catalogue image is a useful starting point, but it leaves out details such as the chair supplied with the desk, the required height setting and the carton contents.

Use the table below when checking an RFQ or a pro forma invoice. Keep unresolved items visible in the order file until both parties have confirmed them.

Identify the exact set first

The C-shaped two-seat configuration pictured below contains one shared desk and two chairs. Its new perforated backrests and lower crossbar should appear in the approved reference image if those are the features being ordered. Dimensions and height settings must still be confirmed in the quotation.

Keep the selected photograph with the specification revision. If a quotation or approval sheet shows an older chair or omits the crossbar, resolve the difference before releasing production.

C-shaped shared desk with two perforated-backrest chairs and a lower crossbar

Attach this checklist to the order

Item What to record What to keep on file
Configuration Model or reference image; desk, stool or chair; pieces per set Dated product image and order line
Dimensions Desktop size, seat height, table height and any required settings Approved drawing or measurement sheet
Board Material, thickness and edge construction Written specification and sample details
Frame Tube section, wall thickness, adjustment and locking method Drawing or supplier specification
Finish Colour reference, gloss or texture, coating requirement Approved finish sample and agreed test evidence
Hardware Fixings, glides, adjustment parts and spare quantities Parts list and assembly instructions
Packing Pieces per carton, dimensions, gross weight and shipping marks Packing specification and carton artwork
Standards Applicable standard, edition, part and model coverage Relevant report or conformity documentation
Commercial terms Quantity by model and colour, named shipping point, payment terms Accepted quotation and pro forma invoice
Schedule Sample approval, production start, inspection and dispatch dates Agreed order schedule

For a classroom project, also attach the room-by-room quantity and size schedule. If cartons need to be sorted by room, agree that before approving the shipping marks.

Check what a report actually covers

EN 1729 separates functional dimensions from safety requirements and test methods. The BSI description of Part 2 makes that distinction. Record the applicable parts and editions for the destination or tender, then check the model and configuration named in the report. A certificate image elsewhere in a supplier's catalogue does not establish coverage for the order.

For board specifications, use the more detailed material checklist. Coating evidence has a separate checklist.

Record the approvals that release production

Our published lead time for standard ranges is 25 days after deposit. Confirm how that fits the actual order, including sample approval, colours, artwork and any custom work. Keep the shipping window separate from the production lead time.

Before releasing the order, save the accepted quotation, specification revision, sample approval and agreed inspection plan together. That gives the buyer, factory and inspector the same reference when production is checked.