A standard order of school furniture takes 25 days after the deposit, and that figure covers a defined sequence of steps rather than a single production block.
This page follows one order through those steps: what happens, when, what we need from you, and what we can confirm in writing. Use it to check whether your own order plan matches what the factory is doing.
Step 1 — enquiry, and the four things we need
The first email should carry the model and quantity per model, the destination country or port, the standard or test evidence you need, and whether you want one mixed container or model-separated packing.
We confirm the model-level minimums, the packing plan and the schedule from that information. The exact minimum for each model is confirmed by email once we have reviewed the enquiry, so it is worth getting the model list right in the first message.
If you want a price that reflects your requirement rather than a catalogue price, say what you need: your logo, a specific colour, an instruction sheet in your language, your own shipping marks. Each of these is workable; each one changes the minimum, because a colour change and a new mould are very different projects.
Step 2 — sample, if the specification needs settling
Samples are available from one piece for every model. The sample is chargeable and the buyer covers the shipping cost. We can dispatch up to five MDF samples within ten days.
A sample is worth ordering when something is still open: a colour, a logo, a packaging format, or a dimension you want to see in the hand rather than on a sheet. If the specification is already written and agreed in the quotation, a sample may add two weeks and tell you little.
Approval of a sample settles the specification. It does not commit you to a quantity, and the production minimum applies when the order is released for manufacturing rather than when the quotation is issued.

Step 3 — order confirmation and deposit
The order is confirmed against the specification: model, quantity per model, colours, packing, destination, the documents you need, and the inspection plan if you are sending an inspector.
Standard payment terms are T/T with a 30% deposit and the 70% balance due before shipment. We also accept ACP and credit card through Alibaba.com Pay. The production slot is booked when the deposit is confirmed.
Custom colours, logos or sizes add a few days for approval, and any adjusted schedule is confirmed on the order rather than assumed. We do not quote a production date that depends on an approval still in progress.
Step 4 — production, inside the 25 days
The 25-day lead time for standard ranges starts after the deposit is confirmed. Inside that window the work runs through eight processes: hollow blow moulding, injection moulding, robot welding, laser cutting, metal forming, powder coating, packaging and warehousing.
Two practical points about small orders. Orders of around 20 to 50 sets often ship in about 10 days, because the same lines run without a full batch. And a mixed container — different models and colours packed together — does not add production time; it adds a packing instruction, which is why we ask for it in advance rather than at loading.

Step 5 — inspection, and who is in the room
If your process requires an inspection agency — SGS, BV, TÜV, Intertek or your own QC staff — tell us at order confirmation so the visit can be scheduled into production instead of arriving after packing is finished.
If you are not sending an inspector, our own routine runs at five checkpoints: incoming material, steel fabrication and welding, powder coating, moulding and assembly, and the pre-shipment check. If you want the approved sample held as the inspection standard, say so when you order.
There is one point where the schedule depends on you. A pre-shipment inspection scheduled after packing has started compresses the window. That is the reason we ask for the inspection plan at confirmation rather than later.
Step 6 — packing, documents and loading
Cartons are labelled against the order line, so a mixed container stays traceable when it is received. Shipping marks, carton marks and the packing list follow the order as agreed, and instruction sheets and warning labels can be supplied in your language with barcodes or QR labels on request.
The 70% balance is due before shipment, and the goods are loaded into the container for the agreed destination and Incoterm.

A timeline to keep next to your plan
| Stage | What you provide | What we confirm |
|---|---|---|
| Enquiry | Models, quantities, destination, standards, packing plan | Model-level minimums, packing plan, indicative schedule |
| Sample | Approval or changes | Specification sheet, sample dispatch within 10 days for up to 5 MDF samples |
| Order confirmation | Approved specification, inspection plan | Order terms, 30% deposit, production slot |
| Production | Availability to answer questions | Production inside 25 days after deposit for standard ranges |
| Pre-shipment check | Inspector access if arranged | Batch checks, carton and mark check against the order |
| Loading | Balance payment | Container loaded for the agreed destination and Incoterm |
The dates in this table are the ones we can stand behind. Anything beyond them depends on approval time, on changes you request, and on the inspection visit being scheduled rather than arriving unannounced.
Send us your target market, quantity and standards, and we will come back with the confirmed minimums, the packing plan, the inspection points and the schedule for your order.