Our entry minimum is 20 sets per model. That number is not a marketing figure applied to the whole catalogue: several models cannot be produced responsibly below 50, 100 or 200 sets, and we tell you which is which before you order. This page explains how those minimums are set, what they cover, and how to build an order that still meets them when you want to mix models.

The minimum is set per model, not per order

An order for 300 sets split across six models is not the same production job as an order for 300 sets of one model. A minimum therefore attaches to a single model, and each model carries its own figure.

  • A001 desk-and-stool set — 20 sets
  • B001 desk-and-chair set — 20 sets
  • L001 and L002 curved desk sets — 50 sets
  • J001 and S001 flagship desk sets — 50 sets
  • L003 and Z002 school-style chairs — 100 sets
  • Youth desk 140 cm with drawer and bookshelf — 200 sets

The pattern is not random. Models with a moulded plastic part, a wider tabletop profile or a heavier steel frame need a longer material or tooling run to be worth starting. A chair that is simply bent tube and a flat board can be made in a shorter run.

Finished goods stacked in the factory warehouse

Finished goods in our own warehouse. The minimum applies to production of a model, not to how the finished cartons are stored.

What the minimum covers

The minimum covers the production run of that model, measured in complete sets. It does not cover:

  • Sample quantities. Samples are available from one piece for every model.
  • A mixed-model container. Different models and different colours can be packed into one container, so a 20-set minimum on four models does not have to become four separate shipments.
  • Your own consolidation. If you are supplying to several schools, you can place several orders against one production plan.

What it does cover is the number of units we will start and finish for that model in one run. Anything below it, we either decline or we quote a price that carries a setup charge you would rather avoid.

Why a higher minimum exists on some models

Three things push a minimum up.

Material batching. A steel order is bought by section and weight, a board order by sheet, a plastic order by masterbatch lot. Below a certain run, the cost of the material is higher per unit because the supplier sells you a minimum batch anyway.

Coating and colour setup. Each colour is a separate powder batch. A 50-set run in three colours is three batches; the same 150 sets in one colour is one.

Assembly line balancing. A short run of a wide-top desk pulls people and jigs across the line in a way that shows up in the finishing hours, not in the material cost.

None of this is a marketing barrier. It is the reason the price per set falls as the run grows.

A worksheet for planning your order

Use this to work out which models you can run at which quantity, and what the total order looks like.

Model Minimum Your planned quantity Sets above minimum Notes for the supplier
A001 20 40 20 Desk and stool, height adjustable
J001 50 60 10 Wider desk, moulded seat and backrest
L003 100 100 0 School-style chair, 100-set minimum
Youth desk 120 cm with drawer 20 30 10 Separate colours in the same container

Read the last column as the part of your enquiry that saves a round of questions: the model, the quantity, the colours, the destination and the standard you need checked.

What to put in the first email

One email with the right content removes most of the back-and-forth.

  • Model names and quantities per model, including how many of each colour.
  • The destination country or port, so packing and documentation can be quoted with it.
  • The standard or test evidence you need for the order.
  • Whether you want one mixed container or model-separated packing.
  • Whether you need samples before production, and which model.

We confirm the exact minimum for each model by email once we have reviewed the enquiry. If a quantity sits below the minimum for that model, we will say so and suggest the closest model or quantity that works.

Samples and the production run are separate decisions

A sample is charged, and shipping is paid by the buyer. We can dispatch up to five MDF samples within ten days. Approval of a sample does not commit you to the minimum quantity — it only settles the specification.

Two points are worth keeping separate in your planning. First, a sample confirms the product; it does not confirm the price of a production run. Second, the production minimum applies when the order is released for manufacturing, not when the quotation is issued.

Packing work in progress before loading

Packing in our own plant. Cartons are labelled against the order line, so mixed-model containers stay traceable at receiving.

Payment and timing for the run you confirm

Standard terms are 30% deposit with the balance due before shipment. For standard ranges the lead time is 25 days after the deposit is confirmed; small orders of around 20 to 50 sets often ship in about 10 days. Custom colours, logos or sizes add a few days for approval, and any adjusted schedule is confirmed on the order rather than assumed.

Send us your target market, quantity and standards, and we will come back with the model-level minimums, the packing plan and the confirmed schedule.