A trading company and a factory can both quote a school desk at a competitive price. Only one of them can show you the line the desk was welded on.
The seven checks below are all answerable before money moves. None of them requires the supplier to prove anything beyond what they should already be able to show.
1. Who owns the production site?
Ask which legal entity owns the factory and which entity signs your order contract. Then ask to see the site on a video call, walking from the entrance to the line that makes your product.
A supplier that is a factory will be relaxed about this. A trading company will redirect the question to a partner factory, and may become vague about the exact site.

2. Which steps happen in-house?
Ask for the process list, then ask which of those steps are inside your own walls and which are subcontracted. The honest answer is often a mix — nobody does everything — but there should be a list.
Ours covers hollow blow moulding, injection moulding, robot welding, laser cutting, metal forming, powder coating, packaging and warehousing across our own plants. Injection moulding, robotic welding and powder coating are the steps we never subcontract, because they decide the strength of the frame, the finish on the visible surface and the consistency of the moulded parts.

3. Can the supplier name the process that causes your main defect?
This is the most revealing question on the list. Ask a factory: “What usually goes wrong in your production, and what do you do about it?”
A factory answers in terms of weld penetration, coating coverage, board density, flash on mouldings. A trading company repeats your brief back to you.
The answer should also connect to a check. If the answer is “wobble after a term of use”, the fix is robotic welding with a jig. If the answer is “paint chipping at the weld”, the fix is coverage on edges, welds and inside corners.
4. Which quality checks happen, and at which stage?
Ask for the checkpoints in the process, not a general quality policy. You want to know that material is checked on arrival, that frames are checked after welding, that coating is checked before cure, and that assembled units are checked before packing.
Our own routine runs at five points: incoming material, steel fabrication and welding, powder coating, moulding and assembly, and the pre-shipment check. Each has named checks underneath it. If a supplier cannot name the stage where a check happens, that check probably does not happen.
5. Who holds the certificates, and under whose name?
Ask for the certificate, the holder name and the expiry date. A management system certificate is issued to a specific company at a specific site, so the holder name on the certificate is the useful part.

We hold ISO 9001, ISO 14001 and ISO 45001 valid to 23 September 2027, China Green Product certification valid to 27 December 2028, Jiangxi Green Ecology and Jiangxi Famous Brand, and the China Eco-Label. Our furniture is CE compliant — tested to EN 1729; CE is a declaration of conformity rather than a third-party certificate, and the test reports are available on request.
If the answer names a certificate you have never heard of, ask what it covers. A certificate in a related field is not a certificate for your product.
6. Who answers when the container is already on the water?
Ask what happens if a defect is found after shipment, and who responds. A factory can trace a defect to a batch and a process. A trading company has to call somebody else.
We keep the sample and the specification sheet against the order, so a question about the tenth container can be answered against the same reference as the first.
7. Does the sample come off the production line?
Ask whether a sample is made on production equipment or assembled for demonstration. This is easy to test: ask for the sample to be built while the inspector is present, or ask to see the unit before it is packed.
A sample that comes off the line is the only reference worth holding. One that was put together in a showroom tells you about the showroom.

How to use the seven checks
Run all seven before you discuss price, and write the answers down. A supplier that answers all seven clearly has saved you the cost of a failed order. A supplier that answers three has told you something too.
If you want a second opinion before your own visit, our plant has already been filmed on site by Intertek for an Alibaba.com Verified Supplier audit, and that footage is published on our site unedited — including the parts of the workshop that do not flatter us.
Send us your target market, quantity and standards, and we will confirm which steps are in-house, what our certificates cover, and what the inspection points are for your order.